Skip to content
POWER100
Content

Tips for the Safe Installation of IT Equipment — EC&M On Air Highlights

⏱️ 5:30 🎤 Ellen Parson
AUDIO EPISODE
Tips for the Safe Installation of IT Equipment — EC&M On Air Highlights
0:00
0:00

Chapters

Click to jump to section

  • 0:00
    Sponsor Message
    An introduction to the episode's sponsor, IEM, and their services.
  • 0:59
    Podcast Introduction
    Welcome to the EC&M on Air podcast, produced by Endeavor Business Media.
  • 1:40
    Introduction to IT Installation Safety
    Host Ellen Parson introduces an article on safe IT equipment installation by Mark Lagamendola, referencing NEC Article 645.
  • 3:55
    Hazards in IT Rooms
    Discussion of six specific hazards found in IT rooms, including self-locking doors, battery backups, high equipment density, grounding errors, hidden infrastructure, and fire suppression systems.
  • 6:33
    Emergency Egress Protocols
    Detailed instructions on verifying exit paths, knowing building exits, and responding to fire alarms in IT rooms.
  • 8:51
    Fire Incident Response
    Guidelines for safely evacuating during a fire, including not fighting fires and proper rescue procedures.
  • 10:05
    Tips for Safe IT Work
    Practical tips for working safely in IT rooms, such as keeping egress paths clear, knowing disconnect locations, using DMMs, and performing tool counts.
  • 11:48
    Conclusion and Call to Action
    Host concludes the episode and encourages listeners to subscribe and visit the EC&M website.

Speakers

E
Ellen Parson
Host — Editor-in-Chief of E&M

Key Takeaways

Always verify emergency egress paths and communications equipment before starting work in an IT room.

Ensure a lighted exit path is available from your exact workspace; if not, create one using portable lights.

During a fire alarm, evacuate immediately; do not attempt to fight the fire or rescue without proper PPE.

Identify the locations of all disconnects, including those for UPS-supplied equipment, before beginning work.

Use a Digital Multimeter (DMM) to check for potential differences between systems and metallic objects to prevent shock hazards.

Keep tools and equipment out of egress paths to maintain clear escape routes.

Perform a tool count before and after work to ensure no tools are left behind, which could cause future issues.

Want the full experience?

Join Power100 for full access to every episode, AI-powered insights, personalized coaching, and a network of industry leaders.

Join Power100 →