Delivering AI at Scale: Construction, Commissioning & Project Execution

Chapters
Click to jump to section
Speakers
Key Takeaways
Prioritize comprehensive planning and standardization of materials and equipment early in the project lifecycle to minimize rework and redesign, especially when facing compressed timelines.
Integrate your supply chain deeply into project planning by pre-allocating products and warehousing items with long lead times (e.g., specialized electrical infrastructure, ribbon fiber) to ensure materials are on hand when needed.
Embrace prefabrication and modularization for components like hot aisle containment and secondary piping systems to shift labor-intensive work off-site, speeding up on-site deployment.
Implement commissioning throughout the entire build process, starting from the design phase, rather than treating it as a final step, to proactively identify and resolve potential conflicts between systems.
Foster highly integrated delivery models by collaborating closely with all stakeholders—owners, EPCs, contractors, distributors, and manufacturers—from project inception to clearly define value and key milestones.
Leverage technology, including AI-powered software, to triangulate information across architectural, engineering, construction, and procurement documents for more seamless project management and reduced inefficiencies.
When planning new projects, work with your client to clearly understand the critical load requirements based on specific GPU chip architectures and the intended longevity of the data center, which dictates design needs.