#765: Exhaust-Only Ventilation, Becoming a Shop Teacher, and Rat Slab Flooring

Chapters
Click to jump to section
Speakers
Key Takeaways
Prioritize keeping ductwork within the conditioned envelope of a building to improve energy efficiency and simplify air sealing, as modern codes increasingly enforce this.
When ductwork must be in unconditioned spaces, ensure it is thoroughly air-sealed and tested before insulation is installed, and ideally, retested after insulation to catch damage.
Consider the 'crack a window' approach for exhaust-only ventilation in suitable climates, as it can be an economical way to manage makeup air and improve indoor air quality, but be mindful of humidity and extreme temperatures.
For old concrete rat slabs, thoroughly assess the slab's stability before tiling; consider crack isolation membranes like Schluter's Ditra for active cracks, or opt for smaller format tiles with flexible thin-set if some movement is expected.
Alternatively to tiling, polishing an existing rat slab can reveal its character and provide a durable, easy-to-clean surface, or consider Luxury Vinyl Tile (LVT) for its forgiving nature over uneven or questionable substrates.
For teaching trade skills, leverage existing programs and experienced educators in other schools to avoid reinventing the wheel and learn best practices for shop setup and curriculum implementation.
Expose students to modern building technologies, like thermal imaging and CAD drafting, even if they won't be using them hands-on immediately, to excite them about the trades and showcase career possibilities.
Want the full experience?
Join Power100 for full access to every episode, AI-powered insights, personalized coaching, and a network of industry leaders.
Join Power100 →