Skip to content
POWER100
Content

#749: IKEA Cabinets, Insulating Post-Frame Buildings and Double Sheathing

⏱️ 54:38 🎤 Host, Ian Schwandt, Randy Williams, Cari Delahanty
AUDIO EPISODE
#749: IKEA Cabinets, Insulating Post-Frame Buildings and Double Sheathing
0:00
0:00

Chapters

Click to jump to section

  • 0:00
    Redwood & Andersen Ads
    The episode opens with advertisements for Redwood lumber and Andersen windows and doors, highlighting their durability and quality.
  • 2:54
    Contractor Business Practices
    Ian discusses the importance of proper financial setup for contractors, including chart of accounts and burden labor rates, to avoid underpricing work.
  • 9:06
    Randy's Chimney Demo
    Randy shares his experience of painstakingly removing an old flue block chimney, detailing the unexpected difficulties and labor involved.
  • 18:24
    IKEA Cabinets Durability
    A listener provides a positive nine-year review of IKEA kitchen cabinets, praising their durability, modularity, and water resistance.
  • 26:00
    Top Star Screws Discussion
    Scott defends Top Star screws for door installations, highlighting their adjustability and ease of use, prompting a discussion among the hosts.
  • 29:49
    Insulating Post-Frame Buildings
    Joe asks for advice on insulating a post-frame building to cabin conversion, specifically regarding thermal bridging and the effectiveness of thin EPS foam.
  • 43:23
    Double Sheathing Wall Assembly
    Shane queries the hosts about a proposed double sheathing wall assembly for his father's durable home in a cold, wet climate, focusing on moisture management and thermal performance.
  • 56:58
    Career Advice for Trades
    Shane shares career advice for tradespeople, emphasizing the importance of finding the right employer and continuous skill development, which the hosts echo.
  • 1:04:40
    GBA Podcast Update
    Randy promotes upcoming Green Building Advisor podcast episodes, including discussions on diagnosing house problems and Allison Bailes's home improvements.

Speakers

H
Host
Host
I
Ian Schwandt
Host — Fine Homebuilding contributing editor and operations manager for TDS Design Build in Madison, Wisconsin
R
Randy Williams
Host — Green Building Advisor's editor
C
Cari Delahanty
Host — producer

Key Takeaways

✦

Accurate financial management, including detailed chart of accounts and burden labor rates, is crucial for contractors to avoid underpricing and financial bleed.

✦

For renovation projects involving messy demolition like chimney removal, sequence the work strategically (e.g., demoing in phases) to minimize disruption and dust for clients.

✦

IKEA cabinet systems can be highly durable and adaptable, offering options for custom sizing and future upgrades with premium doors from third-party manufacturers.

✦

Top Star screws provide excellent adjustability for door installations, allowing for micro-adjustments and future seasonal tweaks without removing trim.

✦

When insulating post-frame buildings, consider the long-term use and conditioning needs; for full-time occupancy, more robust insulation strategies like decoupled framing or a continuous insulation layer are beneficial.

✦

For high-traffic areas or where impact damage is a concern (e.g., farm buildings), consider wainscoting with a more durable material like 3/4-inch CDX plywood or easily replaceable siding sections.

✦

Tradespeople should prioritize finding mentors and companies that foster skill development; if a workplace isn't providing that, it's acceptable to seek new opportunities for growth.

Want the full experience?

Join Power100 for full access to every episode, AI-powered insights, personalized coaching, and a network of industry leaders.

Join Power100 →